Thursday, September 20, 2007

A Note From Jill

Hi Matt:

I took a look at the basement area in question. Yes, the electrical area needs to remain open per code. We were not planning on reinstallating the area where materials were removed for plumber access. We can cut, and install, OSB (oriented strand board) in the area above the washing machine and dryer if you would like.

I can have the electrician look over the light fixture in question when finish electrical is done.

The cabinet installation began today. My design had mentioned the creation of a divided cabinet above either the refrigerator or the wall oven to hold trays and platters. Would you like that item installed above the fridge or oven? My plan was to divide the chosen area in half vertically, than one of the two halves in half again (creating a space for cookie sheets, trays, etc). The remaining half was to be divided in half horizontally (to hold bowls or small appliances). What do you think? Please let me know…..

Attached you will find our change order(s) for the additional work you have inquired about, and also those additional items you have requested be done. Those items that are done and completed have been noted. Please review and advise how you would like to move forward on the other items. Point #10 and #11 refer to the new side entry door you are interested in replacing. Please refer to www.simpsondoor.com to review the two doors mentioned. Give me or Ray a call with any questions you may have.

The kitchen is looking fabulous!

Regards,

Jill