I will check to see when we can arrange for delivery of the cabinets to the garage; do you prefer one side of the garage over another? Is there a key to get in? If so, can you place it in the lock box?

I will let the drywallers (who are working at your house today) know that you would like to have the corners of the new opening “chamfered” (I will go with it being a word).

Electrical—our work order with you specified your supplying the light fixture for the pantry—my understanding from your information is that the electrician is now supplying the light? Let me know if my understanding is correct.

Plumbing—the ball valve installed on the prep sink line was put there for the convenience of the plumbers while they were doing their work. All new shut off valves will be installed upstairs, below the sinks and next to the dishwasher when the finish plumbing is done. The refrigerator water line will be run and installed during finish plumbing. The finish flooring will be in place as well as the refrigerator. The plumbers will only need to drill one hole leading to the basement. Also, if the water supply line is run now, it will get in the way during the floor installation.

The Wauwatosa building inspector was scheduled to be at your home today at 2:30 for another inspection. We let the drywall crew know not to touch the exterior wall until the inspector gave his blessing…….