Tuesday, September 18, 2007

Views & News

I added chronological photos of the north, south, and east views from the other albums. I thought about this too late and therefore do not have the exact same shots throughout. Still, you can get a good perspective of the progress.

They completed the painting yesterday. The lighting in the pics makes it look more yellow than it really is. It turned out well.

They will start on the floor today, I think, and will also begin installing the cabinets this week. They’ll get the templates made for the countertops and then begin cutting the granite. The photo of the granite didn’t turn out too well

The hood will be delivered Wednesday and the remaining appliances will be delivered at the beginning of next week.

I’m not quite sure what they’re going to do with the hardwood floors in the pantry and the front hall. They need to be redone and it should happen now. The tile in the back hall will be one of the last things that they’ll do.

So far, so good.

Saturday, September 15, 2007

Paint Choice

We got our paint today. The walls will be Sherwin Williams 6379, "Jersey Cream" and the ceiling SW 7012, "Creamy".

Paint is expensive - $30/gallon and we needed three of each.

Friday, September 14, 2007

Week Three Is Over

Week three is over and we’re still on track and happy with the progress.

This morning the dry wallers arrived before 7:00AM so I was able to talk with them (although their English was not too good). They are on their last day, fixing a few more spots, smoothing some patches, and then spraying everything. They were quite proud of their chamfering. It was the first time that they had done it. Fortunately they had all our other passageways to use as a guide.

We need to choose our colors this weekend. We’re having some difficulty with this. It’s completely beyond me, so Laurie will have to do the heavy lifting here. We want something that will complement the copper flecks that are throughout the granite. The ceiling and back entrance will probably be different colors than the kitchen and each other.

Our tile plans have changed. The maple in the pantry is nice so we’ll keep that and have it refinished. There is oak under the vinyl in the front hall and, from what we could see under the area they pulled up, it appears to be in pretty good shape. Unless areas further in are in very bad condition, a possibility, we’ll keep that as well.

We need to make an interesting choice about the trim around the two windows. We were originally going to go with a maple to match the cabinets. That seemed easy. However, we saved the wood trim around the door in the dining room and front hall. It’s in excellent condition and matches the trim around all the other windows. There’s just enough to do both of the kitchen windows. Do we have the windows match the new kitchen wood, or do we save part of the original house, and match the existing windows? I don’t know. Suggestions?

All appliances, except the hood, are here and will be delivered next week. The hood is supposed to arrive no later than the 20th. The cabinets are all in and will be delivered next week also. See the schedule in the following posting.

Paint , Schedule, & Appliances

From Jill:

I have had an opportunity to review the paint colors, here is my suggestions:

Warm tones:
Glidden Cozy light 50yy 79/205
Coast light 50yy 83/171

Cool tones (from what I had to choose from):
Vermeer’s Pearl 49gg 83/012
White Lagoon 41bg 76/025

Laurie is not too keen on these colors & she's the decider.

Schedule for Friday—spray sand texture and primer

Monday—touch up plaster and texture in front hallway and dining room. (We may also possibly be able to paint kitchen and dinette ceiling on this day. Please have paint ready)

Tuesday—finish painting walls

Wednesday—Begin floor installation.

Thursday—Begin cabinet installation.

Friday—Cabinet installation.

Also on Monday we will deliver cabinets. Please plan on a payment of $9535.84 plus change order of $725.00 for a total of $10,260.84…..I will be here after 5:00 on Monday for a client meeting, you can plan on stopping by to take care of this.

Jill.

From Carrie:

Hi Matt

The Hood is shipping from Texas to mpls tomorrow. I am getting clarification on when it will be here.

I was told we could deliver the hood the 20th. Possibly earlier.

I will give Jill a call.

Thanks Carrie

Wednesday, September 12, 2007

Details

The drywall is up, mud in the seams. The drywaller will be back today to spray on the final finish.

We met with Ray and Jill to discuss a few details:
• New pantry door will be painted
• New back door will be painted and have a light
• Put new drywall sanded spray coating throughout the back hall and down basement stairs
• Remove basement stair carpet and paint stairs
• Replace radiator in dinette
• Paint all of back hall
• A bunch of details about trim, bases, shoes, and knobs
• Replace wood around vent discharge
• Get quotation on tiling front entrance

We will probably do that last one. We need too and I was holding off because of “project creep,” but since we’re living in chaos now, we may as well get it over with. In for a penny, in for a pound.

We still need to choose the paint color. We will go with an off white for the ceiling and probably a pale burnt yellow in the kitchen. We’ll have to have the rest of the downstairs painted next year.

We’re still moving along well. Cabinets will be delivered next week. The hood should be in next Tuesday.

Ray just called me. He said that the floor underneath the linoleum in the pantry is maple and in good condition. They are checking to see how much there is maple. We may not need tile in back at all.

Monday, September 10, 2007

Another Email from Jill

Matt,

I will check to see when we can arrange for delivery of the cabinets to the garage; do you prefer one side of the garage over another? Is there a key to get in? If so, can you place it in the lock box?

I will let the drywallers (who are working at your house today) know that you would like to have the corners of the new opening “chamfered” (I will go with it being a word).

Electrical—our work order with you specified your supplying the light fixture for the pantry—my understanding from your information is that the electrician is now supplying the light? Let me know if my understanding is correct.

Plumbing—the ball valve installed on the prep sink line was put there for the convenience of the plumbers while they were doing their work. All new shut off valves will be installed upstairs, below the sinks and next to the dishwasher when the finish plumbing is done. The refrigerator water line will be run and installed during finish plumbing. The finish flooring will be in place as well as the refrigerator. The plumbers will only need to drill one hole leading to the basement. Also, if the water supply line is run now, it will get in the way during the floor installation.

The Wauwatosa building inspector was scheduled to be at your home today at 2:30 for another inspection. We let the drywall crew know not to touch the exterior wall until the inspector gave his blessing…….

Jill

4 Emails from Jill

Matt
We received an “ok” from the building inspector for the work to date. He wants to come back and approve the insulation installation that we did (the insulation was not in place when he was first out at your home). We are trying to get in touch with him to schedule the inspection. He is in his office from 8:00-9:00 am and 1:00-1:30 am to take calls to schedule inspections. We are going to try and get in touch with him today during his office hours.

Jill

Matt—you also requested that the new arched doorways be “chamfered” like the other doorways—the additional cost for that work will be $725.00. Please let me know if you wish to proceed with this additional work.

Jill

I will check with Ray today (he is not in right now). We should be ok.

I will also see if we can get some firm numbers together for the additional work you requested last week (pantry door, electrical work to install new hallway fixture, additional painting for the back hallway, tiling the pantry, and new back interior and exterior doors).

Have you selected a fixture for the pantry and will you be supplying the fixture for the back hallway?

Jill

The cabinets arrived last week Wednesday. There is not much room to store the cabinets—is there space in the garage? Otherwise, we will hold off delivering the cabinets until the drywall is installed and the room is ready.

The electrical inspector and the plumbing inspector approved the work that was done in your house. I will check with Ray as to the schedule for the rest of the work and see if we can get it finalized.

Jill

Thursday, September 06, 2007

Granite and Inspectors

We’re nearing the end of week two and the project is about where expected.

Last week the water was roughed in. The plumbers need to redo the water lines to the main sink, though. They connected them to the old galvanized lines behind where a cabinet will be. That’s an obvious potential leak source (galvanic corrosion) so they will run new copper all the way to the new copper in the basement. They also haven’t run the water to the refrigerator, but both of those issues, as well as the city inspection, should be complete today.

The electrical is done, at least as much as can be at this stage. All the old wiring was ripped out, the boxes for the devices and the cans for the lights are in place and wired, and a new panel is installed in the basement. The electrical inspector should be there today as well.

You can see our clothes chute. That 45° bend has caused us a lot of grief. Once we had a pair of jeans stuck in there and it was hooked on something on the inside. I had to lower our Wolski’s bottle opener down on a string and Laurie tied it to the pants so that I could pull them up. Someone probably got fired over this when the house was built in 1929.

Once both inspections are done, Greg and Pat will start putting up the drywall. They cut in the arches around the openings and those look good. It will be interesting to see them when they are complete, but they appear to have matched the arc well.

Yesterday (9/6) we met with Jill to select our specific granite and very nearly succeeded. The granite we choose, Black Galaxy, is a very homogeneous black with copper flecks. Still, we wanted to see ours. When we got there she said that she didn’t have anyone to move it. That’ll be ok, but disappointing. I’ll probably go back.

Friday, August 31, 2007

A note from Jill

Matt:

I stopped by this morning to speak with the electrician and get things in order with him—all seems to be going just fine. The electrician is scheduled to be back on Tuesday to finish all of the rough work. The old Romex will be removed, to the extent that it can, and be replaced with all new wiring. It will be much safer.

The cutout that Greg and Pat made in the wall going to the dining room looks great; it really opens up the space! Also, the complete removal of the support header leading to the dinette area also makes the space seem so much bigger. The header was replaced with the doubled up joists you see when you look up at the ceiling.

Looking at the plumbing and electrical contact I see that a 25% payment on the $8000.00 contracted amount is due on Tuesday (upon completion of rough pluming and rough electrical). Would you want to stop by and drop off a check? The amount due is $2000.00

Walls cannot be closed up until the electrical and plumbing inspections have taken place. The plumbing inspection is scheduled for Tuesday, September 4th. The plumbing inspection is tentatively set up for Wednesday

Our carpenters will be back on Wednesday to complete the doorway framing and complete any other items prior to the arrival of the drywallers

Ray will also meeting with the drywall company, at your house, on Wednesday. The next phase of the project is drywall installation, priming and painting. You should go out this weekend and look at paint colors for the kitchen and dinette area. We will need the paint after next week. Let me know if you would like assistance with your final paint color choice.

Have a great weekend!

Best Regards,
Jill Doss

Shaka, when the walls fell

That's from one of my favorite TNG episodes.

The dining room wall came down Wednesday (pics here). I had been having some difficulty picturing how it would look. Intellectually, it made sense and I thought it would be good, but I couldn’t really “see” it in my mind’s eye. A left-brain limitation, I suppose. It look greats, however. It really opens up that half of the house.

Yesterday (8/30) the plumber did most of what he needed to do, viz., ran the water and drain lines to the prep sink area. He did not run water to the refrigerator location. I am assuming that he is planning on it, but I’ll remind Ray nevertheless.

Today I met with the electrician. We discussed switch and outlet (electricians refer to those as “devices”) locations, light placement, etc. He’s replacing our circa 1960 circuit breaker box and bringing all that up to code. He is also putting a cable connection in the dining room for a computer or TV hookup. All in all, the electrical is fairly straight forward.

Next week Wednesday we're meeting with Jill to choose our specific granite.

Everything should be back on for the weekend. I’ll be working Saturday (mostly for moral support. I'm coming in late - 8:00. My guys are coming in late as well - 6:00) and Laurie is going to St Francis Days.

Wednesday, August 29, 2007

Complications, but not too bad

We had two complications (photos here) with the demolition yesterday.

The transitional opening between the kitchen and the eating area was always a concern. There was a soffit there that seemed larger than necessary. When it was opened up it was apparent that the lintel was structural. That certainly complicated things because that ceiling height was to be the same and there is going to be a cabinet there.

Ray believes that we can remove the lintel and support the upstairs by doubling up on the joists – basically adding 4 more twenty foot long 2”*10”s and adding altering and adding cross members as necessary. That sounded reasonable to me, but I’m a chemical engineer, not a structural.

That will also require replacing the ceiling in the dining area, which we hadn’t intended but should do anyway.

The floor had an interesting, undocumented feature. You can see the top of the block wall on the north side of the laundry room. That doesn’t appear to be an issue although we will most likely require a transition piece between the kitchen and dining room floors.

It was very hot and miserable yesterday. We will be delighted when the demolition phase is over.

Tuesday, August 28, 2007

A Note From Our Designer

Matt:

The work in the pantry was limited to removing and replacing the shelving and running new electrical to install a light fixture (supplied by you). We had not planned on removing or replacing the flooring in this area. Should you wish to replace the floor, I would suggest that tile be used. It would be continuous in look with the back hall area. Please advise if you would like to proceed with this. I would need to explore costs.

We are bringing in approx. 6 slabs of Black Galaxy, for you and other customers. If you would like, you could come in and take a look at what we have and tag the pieces with your name. This is not a requirement and you know I will make sure I pick out the best materials for you.

Demolition continued today—there was (3) layers of wood floor underlayment below the carpet and padding and vinyl tile! Wow! (A lot more than is usually found).

There will be final demolition tomorrow and the door framing will start taking place. The plumbers are schedule for Thursday and Friday. The electricians are scheduled for Friday and the following Tuesday (no work on Monday). Once we are past the initial “grunt” work and the area has been cleared of debris, a firm schedule can be put into place for all of the work remaining.

The dumpster will be picked up on Wednesday—we will use trash containers to haul away debris after Wednesday. This should make it easier for you to park your cars!

Ray will be calling you yet this afternoon. He would like to meet with you tomorrow morning to discuss some construction related issues that need to be decided upon in order to continue moving forward. I will not be able to be there, as I have an appointment first thing in Menomonee Falls . Ray will fill me in.

After next week, walls will be getting closed up and the kitchen will start to take shape! I will be in touch with Carrie at Kennedy Hahn in regards to appliance delivery.

We continue to move forward in a positive way…..

Regards,

Jill

Week 1: Demolition

Our project started on time and on schedule. When I got home Monday night the guys, Greg and Pat, were just cleaning up. In the driveway was a fifteen yard dumpster, filled to capacity with what used to be our kitchen.

They had almost everything completely out – walls and ceiling down to studs, electrical and plumbing off, soffits gone, appliances either moved (microwave and refrigerator) or tossed (everything else), carpet ripped out.

Today they will remove the floor and the ceiling in the eating area (our first bit of project creep), the insulation and some dead wiring. The electrician and plumber should start tomorrow.

Last night we made hamburgers, figuring that they’d be easy to prepare. I suppose they were easier than paella, but still too much work considering the status of the rest of the house. I believe we’ll stick with sandwiches, cereal and take out for a while.

Greg told us that they are figuring on five weeks for completion. That puts us at October 1st, 2007. Let’s keep our fingers crossed!

Friday, August 24, 2007

Packing, 5Sing, Elvis, and Banks

We’re starting on Monday. Hard to believe. It’s taken 5 months to get to this point.

Last night I moved a lot of furniture, packed up a bunch of things, took down most of the art, and rolled up the rugs. Laurie was out with friends seeing Elvis.
She’s taking today off to do a lot more packing. I suggested the heuristics she uses when packing are:
• If you don’t think we’ll need it in the next six weeks, we wont: pack it.
• If you don’t think we’ll need it at all, we won’t: toss it.
• If you don’t remember it: toss it.

I believe it was Brother Dan who suggested moving every five years just so that you can purge your stuff. We’ve been in the house 14 years now…ouch. My niece Madeline is supposed to stop by this weekend to pick up a computer. We’ll make her carry boxes.

I spoke with our back about shifting our home equity credit to a loan. Their interest rate is 7.55%. I also went through Lending Tree. Within 10 minutes of submitting my application I started getting phone calls: pretty efficient. The lowest rate I got from them was 7.29%. That’s not much and I’d rather stick with my bank. However, I’ll wait till the projects complete in the hopes that Bernanke caves on interest rates. I suspect that M&I will match the rate I got through Lending Tree.

Anyway, we’re preparing to eat off paper plates, cook with a microwave, grill out everything (wonder what will happen to bacon), and eat out a lot.
Demolition photos next week.

Tuesday, August 21, 2007

A Note From Our Designer

This is from our designer regarding our schedule. Demolition begins in six days.

Matt:

Yes, we are scheduled to start next week Monday at 8:00am. I have arranged for the dumpster to be delivered on that day (I assumed you would not want it delivered on Friday, blocking access to the garage over the weekend). Waste Management is not giving me a delivery time, just in the morning. We will start demo, if the dumpster is not delivered until later in the morning we will put cabinets, etc outside. The dumpster is 8 feet wide (the same width as your driveway). I want one of my guys there to direct the delivery.

Ray and I have the schedule 99% complete—we were waiting on ETA of the cabinets and windows—we received that info this morning and will complete the scheduling today. I will have something for you tomorrow.

You and Lori (sic) should begin boxing up all excess kitchen products and have the kitchen cleared out for Monday. Keep out just those items you will need to have access to for the next month. Plan on paper plates, using the microwave and take out/eat out for the next several weeks. Determine where you would like the refrigerator and microwave moved to (the family room and dining room?). Also, the dining room table and chairs should be moved out of the dining room or moved to the side and covered with plastic drapes for protection. Please remove all art work from walls and pack away any breakable items (remodeling often creates vibrations; we would not want to be responsible for any valuable items falling and breaking). We will put up plastic drapes over the doorways to help contain the dust.

In the next week/10 days you will need to plan on visiting Wisconsin Stone Design (a granite wholesaler here in Milwaukee ) to select the (2) slabs of Black Galaxy to be used for your countertops. The material has very little color or pattern variation. Should you prefer, I can visit them myself and select your granite slabs for you? Please let me know your thoughts on this matter. If you would like to select you material, I will provide you with the address and phone number of the facility and you can make an appointment to visit them.

Please feel free to contact me should you have any additional questions. We look forward to a successful project!

Regards,

Jill Doss
Kitchen and Bath Designer
Artisan Kitchen and Bath Gallery/Granite Surfaces International

And a note on the appliances:

Jill said tentative delivery 9-10.

1/2 of the items are in now. Ventahood is on order.

We should be good.

Carrie

Thursday, August 09, 2007

More on Hoods

Who’d have thought that a hood would be the most complicated issue? I guess that makes sense: moving air is much more complicated than one would imagine.

Several people, my sis-in-law Doreen included, have recommended the 30” height above the cook top. We do make a lot of stock pot type things (stock, fried chicked) so that made a lot of sense.

I called Ventahood to ask if the hood spec’ed out by Kennedy-Hahn would work at that height. They asked about the cook top we’re getting and immediately said that that hood SLDH14136SS is the wrong hood. With the BTU output of our cook top, we’d need a 18” high hood, the SEPH18236SS, not the 14”.

I spoke with Carrie at K-H and she changed to the larger hood.

Links

I’ve added links to our existing kitchen and drawings of our design. I have a layout drawing, but it’s a ‘.kit’ file that I can’t open. I will post that when I get it figured out. I will continue to post links to photos as the job progresses.

Jill was over last Friday with the guy who will be building the two new windows. She’s coming back tomorrow to put a lock box on our door, drop off a sample of our counter tops, and to match some colors.

They will be putting a dump box in our driveway. That will be interesting; I’m sure it will have to be a small one. It’s only 9’ from our hour to our neighbor’s house, a fact I need to deal with every winter when I need a place to put snow. Typical Wauwatosa.

The cabinets, still our critical path, should be done sometime the week of September 9th. That give us two solid weeks of demolition and prep work.

Tuesday, August 07, 2007

Complication

We’ve hit a small complication regarding our hood. For some reason I thought that we were going with the Dacor hood, but Carrie at Kennedy Hahn and Laurie tell me that it is actually a different Ventahood model. I must cracking up, but that’s not the complication.

Counter top height is 36” above the floor and that’s where the cook top will be. The hood sits 24” above that and is 14” high. A six inch duct is covered by a 10*10” square duct cover that is 22” long, making a full 96” or 8ft. Our ceilings are 101”, so we’re off by five inches.

We have three options: raise the hood, increase the length of the cover, or build something around the last 5” to meet with the stainless duct.

I don’t want to raise the hood because it would affect performance. I’m told that the lead time on the custom cover is 4-6 weeks. That’s ridiculous. I am waiting to hear more about the third option. That may the easiest but I am concerned that it will just look like the duct cover is too short.

Friday, August 03, 2007

Update

All things considered, I wish that they'd start. But we have a lot of things to do in the next three weeks, so I guess it's good we have the time. We gutsily made plans for 8/24 (dinner at Whole Foods with Amy & Sara) and already have plans for 8/18 (Dirty Rotten Scoundrels), so we need to get cracking.

This weekend we will begin packing up stuff we won't be using and hopefully 5S-ing a lot of it. We've been collecting boxes and our friend Pat W. has a bunch from his company for us.

Jill is stopping by today (Leone, Laurie's sister, will be there) with the guy who is making the windows to get some measurements.

The test on the sample of our old flooring came back negative for asbestos, so there will be no delay there.

We plan on getting new dishes and flatware. Hopefully we can get it on line, but Laurie may insist on going to look.

Monday, July 30, 2007

Appliances III

We put the 25% down on our appliances Saturday. We went with all the selections mentioned in a previous post, with the exception of a Dacor hood instead of the Ventalux and a right hinged refrigerator instead of the French doors.

The rule I heard was that you should have 100 scfm airflow from a hood for every 10,000 BTUs that the cooktop has. The sales rep said that the Dacor hood with one blower has 300 scfm but that it's "equivalent to 450 in other hoods." That sounded like a sales pitch to me - 300 scfm is 300 scfm. We got the two blower hood.

The appliances are not on the critical path.