Friday, July 27, 2007
Sandbagged
I had suspected that they would sandbag on that amount and it seems like they did. I imagine that they did the same on the $3,500 plumbing allowance.
I guess I'll use their contractors.
Pow!
We agreed on our project yesterday.
I had them pull out the electrical and plumbing until I decide if we want to go with my guys or theirs. I suspect that we’ll go with my electrical and their plumber.
We were there late last night and Jill was unable to process our home equity card, so I need to stop by today to put down the deposit (50%). At that time she’ll have the amended contract.
She expects that they will start on or about august 20th and it will take six to eight weeks. Ray, the owner, thought it would take about five. I will press them for a Gantt chart. I am hoping for our first entertaining meal on October 7th.
Tomorrow we need to go and put some geeters down on the appliances, so that they can "release the specs” to Artisan, as though we need to keep that info out of the hands of Al Qaeda. We’ll go with the Dacor cooktop, warming drawer, oven, and oven/micro. We need to press them on the refrigerator and the dishwasher, but that shouldn’t be an issue.
I have never done anything like this before and am unsure how to feel about it. I’m pretty excited to see the final result, but my
I will begin a web album shortly.
Tuesday, July 24, 2007
Electrical Subcontractor
Tony checked out every thing, noted the areas of concern, and will be sending me a quotation in the next couple of days. He asked how I wanted it quoted, as a proposal from his company, or as a side-job by one of his guys. He said there would be about a 30% difference in cost. They are a union shop and side jobs are not allowed. However, a wink is as good as a nod to a blind man.
Our kitchen designer said that their electrician said that our current 100 amp service is adequate. Tony said it may or may not be. Upgrading to 200 A will be about $250. Now is the time.
Jim Krzewinski, the brother of my long time friend Joe, took over his dad's electrical business and will be coming out Friday to give me another quotation.
I called WE Energies to see what all would be involved to upgrade our service. The wait on their customer service line was 9 - 14 minutes. They have a very nice feature where you can enter a call back number and, when your turn gets close, they call you back. You don't lose your place in line. That was convenient.
I told the guy what I wanted to do and he asked my name, address, and phone. Then he said "Are you still employed with We Energies?" I told him that my spouse was.
I find it very interesting that their customer service people would have a cross referenced list of employees and customers. I hope that means we get extra special service.
Friday, July 20, 2007
Proposal Review II
I met again with our designer, Jill, and Ray, the owner of Artisan K & B. Laurie was unable to attend because of a tragic incident.
They included the omissions from before, the painting, water to the refrigerator, and estimates on the floor underlayment and baseboard repair. They hadn’t thought about the radiators and that may be problematic.
We discussed changing to cast iron sinks instead of stainless and they had the fixture they are recommending. I’m not sold on it, but it’s growing on me. That’s a detail.
They broke out the electrical ($4,500) and plumbing ($3,500), and again tried to dissuade me from using someone other than their contractors. I’ve called a couple of electrical contractors I know for an estimate and will probably call a plumber as well. We haven’t decided if we want to manage that or not, but we’ll probably save $2-3K if we do.
They did not include the front or back halls and are putting together some numbers on that. Both should be about $1,000.
The estimate rose to $43.7K w/o appliances.
The latest issue of Consumer Reports features kitchen remodeling and appliance reviews. We’ll probably go with their dishwasher recommendation (a
They are sending out a sample of our flooring to see if it contains asbestos. If it does, well need to handle that.
Now we need to decide to pull the trigger. That’s the hard part. For me, at least. Laurie is full speed ahead!
Tuesday, July 17, 2007
Proposal Review
We met with our contractor yesterday. Our potential contractor, I should say.
We discussed sinks, stainless v enameled cast iron, single v double bowl, colors of granite, handles on cabinets, 1hp v 3/4hp etc, etc.
Then we went through their proposal. It was pretty comprehensive but had some things in it I didn’t like.
- Although they were no longer going to move the south wall, they still were going to remove the clothes chute. We scratched that.
- “Customer is responsible for priming and painting of repaired drywall.” What? We’re having all this work done but they’re not going to paint the walls? Jill said that some people like to do their own painting. We eaplained that we are not some of those people (have you met us?!?).
- They are subcontracting the electrical and plumbing work. I asked to have those two items listed separately. We may want to choose our own contractors. They didn’t seem too keen on this, but is worth exploring.
- They did not include water to the refrigerator
- “Does not include any underlayment materials or labor to install…” I need an estimate of this cost.
- 110V plug for the microwave. This will probably have to be hard wired.
- Nothing is proposed for either the front or back entrance.
- Nothing is proposed for the radiators in the kitchen.
We’re not really that far apart, but these details need to be worked out. We’re meeting again this Thursday to discuss further.
Tuesday, July 10, 2007
More On Appliances
Unfortunately the cook top is one step down than the one we choose. It does not have as low simmer settings, which doesn't bother me, but it also tops out at 14kBTU/hr instead of 18kBTU/hr. I need to think about that.
Actually, I'm just guessing about those units. Burners are described as "14,000 BTU" or "18,000 BTU," but that has to be a rate and needs a time unit in the denominator. Hours seems the only reasonable choice. Perhaps other knowledgeable people can clarify.
The microwave is also a step down. It is just a microwave, no convection component.
The cost difference is $4,000 below what we picked, but only $540 below what they are originally.
We're still thinking.
Friday, July 06, 2007
Estimate
We're meeting her next week Thursday, 7/12, to start working out the details. I think we'll go with this design. Hopefully we can begin the project within a few weeks.
If all this clean living pays off, we'll be done by Labor Day.
Tuesday, July 03, 2007
No Estimate Yet
She already had the list of appliances that we picked out (they're in cahoots! Cahoots!!) and I told her the options that we're tentatively choosing. It all depends on her estimate.
Thursday, June 28, 2007
Appliances II
If we buy online, we'll save the 5% sales tax...hmmm. Is it worth the hassle?
We will meet with our designer sometime next week for their estimate. If that's a go, we could be started in a few weeks. Their timeline was about five weeks.
After our bathroom delays, we can hold our breath that long.
Monday, June 25, 2007
Appliances
We went to look at appliances this weekend. These are the ones we’re considering:
EF36BNDFSS Dacor French Door REFRIG BTM MT CAB 20 STAINLESS REFRIG 36" SS
PGM365-1S/NG Dacor COOKTOP GAS 36 STAINSTEEL COOKTOP SS
ECS130SCH Dacor BI OVEN SINGLE 30 SS/CHROME OVEN SGL 30 SS
DCM24S Dacor MICRO COUNTERTOP CONVECTION ST MICRO SS
EWO30SCH Dacor WARM DRW 30 SS/CHROME WARMING DRAWER SS
D3232XLSS Asko DW BUILT IN 24" SS Cup Handle
SEPH18236SS Ventahood Chimey Emerald HOOD 36 SS
We got a quotation from Kennedy-Hahn appliance in Wauwatosa. I'll get another from Guyer's.
Soffits
Soffits
We have soffits in our kitchen. In fact, there are 12 separate vertical faces. Any time I see a soffit I always think that it is there for a reason, especially in someplace like a kitchen. Why lose the space if they aren’t hiding something? So, the soffits in our kitchen are cause for concern.
We will be meeting with them again sometime next week to get their quotation. I hope that I’m not shocked again.
Actually, the events of the past week have made me want to loosen the purse strings. I’ll probably get over that, but that’s what I’m thinking now.
Thursday, June 21, 2007
Artisan Kitchen & Bath
Tuesday, June 19th , we met with another designer, Jill, from Artisan Kitchen and bath. We first met with her at our house on June 7th. She had two designs for us, one removing part of the dining room wall, and one not.
We’re leaning toward having that wall removed. The windows on the north wall of the dining room will really let a lot of light in.
Her design takes about one foot from the pantry, moving the south wall back that amount. The door from the back hall stays the same. The refrigerator is on the west end of the south wall and cabinets are on its right.
Directly across from the ‘fridge is the wall oven, or ovens – we haven’t decided yet. To its right will be a countertop and prep sink with drawers below: no cabinets since that wall will be gone.
The east wall will be similar to what we have. The main sink will stay where it is and we’ll put a 36” gas cook top where the oven is.
They’re over at the house as I write this looking at structural, electrical, and plumbing issues.
The next step will be to meet week after next to discuss costs. I like this outfit. They are considerably smaller than Wisconsin Kitchen Mart and I like that. It all depends on the money now.
Thursday, May 31, 2007
Temporary Rookie
So we got a 18 cu ft Frigidaire for $450. We'll use it for the months that we need it and then move it into the basement for find a home for it. I have a scheme...
Fate Plays A Card
We’ve decided that $80K is too much to spend on a kitchen. I called our designer and told her that and told her to eliminate the prep area on the south wall and add a prep sink on the east wall, on the opposite end from the oven.
When we got back from
Our refrigerator has been failing for a while. Now it can keep ice in the freezer, but cannot get the ‘fridge below 60F. I’m pretty sure that it is a Freon issue. We were hoping that it will last until we get one with this whole project, but now it looks like we’ll have to buy one now. We’re going to look at them tonight.
Today I called another design place, Artisan Kitchen & Bath, and we will be meeting with them next week Thursday for another design.
Wednesday, May 16, 2007
Design Meeting
Yesterday was our kitchen design meeting with Janell at Wisconsin Kitchen Mart. Despite the rain, we both arrived exactly on time at 5:00PM. Janell was waiting for us. She explained that she first wanted to go over the design, then look at the specifics and consider options.
When you enter our house by the driveway door you are walking north. Immediately inside there is a small landing, about three feet, with a wall on the right and the stairs to the basement on the left. Up two stairs on the right, there is a small pantry with the clothes chute, and the door to the kitchen is straight ahead. The wall on the right has hooks for coats and a shelf for hats & gloves.
The door leading into the kitchen proper, which currently faces north, would be moved 90 degrees and open to the east, facing the direction of our TV room. Immediately to the right of that entrance we currently have a small dining table. That wall would have a small prep sink with cabinets and counter tops on either side. The prep sink would be a black enameled cast iron Kohler sink, with disposal, and the counter tops would be black granite. The TV room would not change except for a small wall on the right hand side of the cabinets to frame the space.
To the right of the new kitchen entrance, on the wall where or stove and sink are, would be a double Dacor over, the refrigerator with a right hand side hinge, and counter tops and cabinets extending to the dining room wall. The cabinet enclosing the oven would not reach to the ceiling so that we could store pots up there.
The wall separating the dining room and kitchen would be removed. Along that wall, where our current refrigerator is, would be the main sink, again black enamel, and counter tops. There would be another counter top behind, raised about four inches so that people could be on bar stools in the dining room and still converse with those in the kitchen.
Opposite that, where the Tupperware cupboard is, would be the cook top, again a Dacor, with cupboards on either side, drawers below and an open pot storage directly beneath the cook top.
The floors would be oak hardwood and would extend into the front hall. The cabinets would be either maple or birch with a light stain to contrast with the dark counter tops. There would be under cabinet lighting throughout and canned lighting on the ceiling.
We will probably need to upgrade our electrical to 150 amps. 200 would be more than we need, but the incremental cost would be small.
After the meeting we were both pretty overwhelmed. There were a lot of details and it was difficult to get our heads around the change in layout.
We’re mulling it over now and need to make the critical decision: do we really want to spend $80,000?
Wednesday, May 09, 2007
The Next Meeting
Wednesday, May 02, 2007
The Boys' Room
We 5S'd it, cleaned it top-to-bottom, and bought a bed. We even put one of our Persian carpets in there. Laurie did nearly all of the work. It still needs to be painted and have some other remedial work done on it, but this is the Year OF The kitchen and we're not going to do much more than we already have.
Still, it's ready for guests as on 10 May 2007.
Thursday, April 26, 2007
The Bank
I went to Marshall & Ilsley to talk to our banker. The interest rate on our remaining house loan is 5.5% and the rate on our home equity line is at Prime, 7.25% I think.
I told her what we’re doing and about how much we’ll be putting on our line. I will want to lock that new loan in at some interest rate – either combining it with our existing note or having a separate one.
If we combine the two, we lose the low rate on the existing but get a lower rate on the new quantity. Or, we keep what we have and take the higher rate on the new amount.
That’s not a decision. The math will work out the way it will work out. The color of the granite is a much tougher problem to solve.
Wednesday, April 25, 2007
Looking At Display Kitchens
On 4/24/07 we went down to meet with our designer again and look at some display kitchens in order to come up with a close-to-complete design.
The Sub-Zero refrigerators, although fabulous looking and made right here in
I very much liked the five burner Dacor cook top. It’s arranged three in back, two in front with the five controls in the spot where a sixth burner would be. The Dacor is a professional grade, up there with Viking. They also make ovens and we’ll probably go with two of those.
The granite counter tops look great but we didn’t really see a color that we liked. We’ll have to go to the granite supply place and have a look around. Never thought I’d be doing something like that.
We are torn on the flooring between vinyl “tiles” and cork. They’re about the same cost, both look good and are easy on the feet. We’ll need to see some final designs in order to choose.
We’re leaning for fairly traditional birch cabinets. The counter tops will most likely be dark and will therefore go with a lighter stain. The hinges will be visible. We are pro-hinge.
Our choice or two sinks, one large single compartment one small, both enameled cast iron with a single handle faucet is still our preference.
The next step will be for our designer to make the design and get it to their art department to make up the final drawings. This should take about two weeks. Our timeline for completion is August.
Thursday, April 19, 2007
Meeting With A Designer
We met with a designer from Wisconsin Kitchen-Mart on Wednesday April 18th. This is the largest project that we have ever had done by far and had as many questions as answers. We told her some general things about us and what we were looking for; a kitchen designed for people who like to cook, a general budget range, and some ideas so that she could get the general feel of our limits.
She then asked us a series of questions in order to put together the pieces of the design:
- Countertops? They don’t recommend concrete as a work surface – granite is better.
- Six burner cook top with some high BTU burners.
- Double oven
- Cabinets? We’re not sure. Frosted glass? Paint? We’ll need to look.
- I want a rack to hang pots and pans.
- Refrigerator? We don’t know. French doors maybe? No wood, however.
- Dishwasher – would a dish drawer work for us?
- Cooking hood – we want stainless
- Floor – hardwood to match
- Tile behind the counters
- Sink? Prep sink and main, enameled cast iron.
- Two garbage disposals
- Single handle faucets with a hot water tap and a dish soap dispenser.
- Perhaps an under-counter wine cooler
We want to use the back hall pantry as much as possible. We’ll loose the clothes shoot, but gain quite a bit of square footage.
She also asked about opening the north wall, where the existing refrigerator is, to the dining room and putting barstools on the dining room side. We would have never though of that and told her to put it in the design.
She took a whole mess of measurements and said that it would be about 10 days to put a design together. Saturday we need to go to their show room to make some choices.